Big Door Prize — Quepos
A foreign developer in Manuel Antonio needed potable water, but the connection required 2.2 km of pipeline, crossing a national ro…
View full case →When AyA conditions your water availability on building a line extension, you face a maze: hydraulic design, sealed drawings, national road-cut permits, easements, construction to standard and the final inspection. If one piece fails, the work is not received and the water never arrives.
Over 10 kilometers of potable water lines designed and built: Big Door Prize (2,242 m, ₡85.8M), ASOPROQUEPOS (1,827 m), Palmas Pacífica (1,888 m), GranSol (1,347 m), El Salto (1,615 m in progress), Tejona-Tilarán (2,400 m) and more.
Yes. We have processed and executed national road cuts before MOPT and CONAVI in Quepos, Esparza and Guanacaste, under RAM's technical responsibility.
Our track record: works received without observations, documented with reception records. We design from day one with the reception requirements in mind.

A foreign developer in Manuel Antonio needed potable water, but the connection required 2.2 km of pipeline, crossing a national ro…
View full case →
The same developer behind Big Door Prize now needed 1.9 km of line with a relief valve and a new easement for his next project in …
View full case →