WhatsAppRequest assessment
Palmas Pacífica — Quepos
Line extension · Easement · Repeat client

Palmas Pacífica — Quepos

1,888 mPVC pipeline 100 mm
₡33.0MCFIA valuation
3projects from the same client
Documented case · Quepos, Puntarenas

Palmas Pacífica: the third project of a returning client

1,888 meters of pipe with a relief valve, an easement in progress, and current water capacity letters. The project that confirms an international developer's trust.

Palmas Pacífica project area in Quepos
01
The starting point

Formalize to consolidate

The development needed to formalize its supply infrastructure and regularize the easements to meet AyA's requirements and consolidate access to potable water.

The client wasn't new: the same developer behind Big Door Prize, who after that project trusted RAM again — first here, then with Rickdonna.

3projects from the same client
Technical work on the project
02
The engineering

1,888 meters with pressure control

Complete hydraulic design, plans, and APC-CFIA processing (code 1095504) for a 1,888-meter, 100 mm PVC line, including a 100 mm relief valve for system control.

CFIA valuation of ₡33.0 million and case file FAM-8141 before AyA, with permanent institutional coordination and follow-up.

1,888 m100 mm PVC + relief valve
Palmas Pacífica project progress
03
The management

Easement and current water capacity

The constitution of the easement in favor of AyA advances as an integral part of the project, along with institutional follow-up of the file.

The project's water capacity letters have been kept current — including their 2025 renewal — so the development never loses its position with the operator.

2025capacity letters kept current
View of the Palmas Pacífica development
04
The meaning

Client loyalty as the metric

In infrastructure consulting, the most honest indicator isn't a number: it's the client coming back. Three consecutive projects from the same international developer — Big Door Prize, Palmas Pacífica, and Rickdonna — tell that story.

The project advances in formalizing its water supply per AyA's requirements, documented even with 2025 drone footage.

FAM-8141case file before AyA

The client who came back — twice

1,888 meters designed and processed, current water capacity, and an international developer who has entrusted three consecutive projects. That's how long-term relationships are built — with the right engineering.

1,888 mof pipe designed and processed
₡33.0 MCFIA valuation
3projects from the same client
2025water capacity renewed
Request assessmentAsk on WhatsApp

Construction gallery

Technical data

Tubería1.888 m PVC 100 mm
Código CFIA1095504
Tasación₡32.990.000
ServidumbreEn gestión a favor de AyA
ClienteDesarrollador extranjero (Big Door Prize)
UbicaciónQuepos, Puntarenas

Facing a similar challenge?

Let's talk about your project. The initial assessment is at no cost.