
Water availability (carta de agua)
We turn “no water” into a viable path: diagnosis, full processing before AyA, ASADAS and municipalities, and solutions for complex cases.
→We design, permit and build the complete potable water solution — from the availability letter to formal reception by AyA. Water engineering for developers and landowners across Costa Rica.
We diagnose the real cause and execute the route to reverse it: extension, agreement, well concession or appeal.
→We build it turnkey: CFIA design, MOPT/CONAVI permits, construction and reception without observations.
→Water due diligence before you sign: operator, capacity, distance to network and the true cost of connecting.
→
We turn “no water” into a viable path: diagnosis, full processing before AyA, ASADAS and municipalities, and solutions for complex cases.
→
Engineering sealed by CFIA, national road permits, construction, certified materials and interconnection — delivered until AyA formally receives the work.
→
If your project depends on an ASADA (rural aqueduct), we provide the technical studies AyA requires so the ASADA can legally grant you water.
→
Legal water where no public network exists: hydrogeological studies, pumping tests and the complete concession process before MINAE and SENARA.
→
When the pipeline must cross third-party land, we constitute the easement in favor of AyA: surveying, registry work and the complex cases others abandon.
→
A legal route to formal water service for consolidated communities and subdivisions of irregular origin, through agreements with AyA or ASADAS.
→
EPANET modeling, network and tank design, CFIA-sealed drawings and storm drainage. Engineering that institutions approve.
→
The technical-legal route when the normal path closes: sewer exemptions, discharge permits, administrative appeals and constitutional remedies.
→
A foreign developer in Manuel Antonio needed potable water, but the connection required 2.2 km of pipeline, crossing a national ro…
View full case →
A social-interest subdivision in Esparza needed its complete potable water network, with the quality standards and tests AyA requi…
View full case →
A producers' association in Quepos needed nearly 2 km of line extension with a national road cut and an easement — beyond the reac…
View full case →We analyze your case: surveys, location, water operator and history. We tell you honestly what is viable.
We define the path with the highest probability and lowest cost, with a clear timeline and price.
We execute the paperwork and/or the construction under CFIA technical responsibility.
We deliver the formal result: availability letter, concession, agreement or work received by AyA.
Tell us your case. The initial assessment is free, in English, no strings attached.
“Smart water use today guarantees prosperous cities and a dignified future for our children.”— Ariel Araya Ly, CEO