WhatsAppFree assessment
Tejona — Tilarán, Guanacaste
Long-distance line extension

Tejona — Tilarán, Guanacaste

2,400 mof pipeline installed
Guanacastework zone
540+construction photos on record

The challenge

Bringing potable water across 2.4 kilometers in the Tilarán highlands: RAM's longest pipeline to date, with the logistics of working far from home base.

The RAM solution

Staged planning, in-house crews and daily photographic control of progress: trenching, installation, testing and reinstatement, replicating the quality standard AyA requires to receive works.

The result

2,400 meters of pipeline installed and documented. Proof that the RAM formula scales to larger works in any region of the country.

Construction gallery

Technical data

Tubería2.400 m de tubería de agua potable
UbicaciónTejona / Santa Rosa, Tilarán, Guanacaste
RegistroObra documentada fotográficamente etapa por etapa
EstadoExpediente 2025

Facing a similar challenge?

Let's talk about your project. The initial assessment is free.

Other projects

Big Door Prize — Quepos

Big Door Prize — Quepos

A foreign developer in Manuel Antonio needed potable water, but the connection required 2.2 km of pipeline, crossing a national ro

View full case
GranSol — Esparza

GranSol — Esparza

A social-interest subdivision in Esparza needed its complete potable water network, with the quality standards and tests AyA requi

View full case
🗨