The challenge
A condominium project in Santa Teresa — one of the most water-stressed areas in the country, without sufficient public network — needed a legal, reliable water source.

A condominium project in Santa Teresa — one of the most water-stressed areas in the country, without sufficient public network — needed a legal, reliable water source.
RAM executed the hydrogeological studies, the pumping tests under official guidelines and the complete concession process before MINAE's Water Directorate.
Two groundwater concessions granted: the project has its own legal, properly sized water source. The route RAM masters for coastal areas without a network.



| Concesiones | 2 de agua subterránea |
| Estudios | Hidrogeología + pruebas de bombeo |
| Instituciones | MINAE Dirección de Aguas / SENARA |
| Cliente | Condominio, Santa Teresa de Cóbano |
Let's talk about your project. The initial assessment is free.

A foreign developer in Manuel Antonio needed potable water, but the connection required 2.2 km of pipeline, crossing a national ro…
View full case →
A social-interest subdivision in Esparza needed its complete potable water network, with the quality standards and tests AyA requi…
View full case →