San Miguel Line Extension — Barranca
Line extension · Easement

San Miguel Line Extension — Barranca

200 mpotable water pipeline
₡15.0MCFIA valuation
Builtinterconnected to AyA

The challenge

The development required potable water supply infrastructure and compliance with AyA's technical and legal requirements, including the easement needed to formalize the system.

The RAM solution

Hydraulic design, plans, APC-CFIA permitting, materials supply, construction of the line extension, technical direction, pressure testing, interconnection coordination, AyA management and constitution of the easement in favor of AyA.

The result

Infrastructure built and interconnected to the potable water system, meeting AyA's technical requirements to supply the residential development.

Construction gallery

Technical data

Tubería200 m
Código CFIA1114617
Tasación₡15.000.000
ServidumbreEn trámite de constitución a favor de AyA
UbicaciónSan Miguel, Barranca, Puntarenas
Año2025

Facing a similar challenge?

Let's talk about your project. The initial assessment is free.

Other projects

El Salto — Quepos

El Salto — Quepos

The development was historically supplied by a private well and multiple expansions built over the years. Regulatory changes force

View full case
Big Door Prize — Quepos

Big Door Prize — Quepos

The development needed water availability and distribution infrastructure to meet AyA requirements and make the tourism project vi

View full case