The challenge
The development required potable water supply infrastructure and compliance with AyA's technical and legal requirements, including the easement needed to formalize the system.

The development required potable water supply infrastructure and compliance with AyA's technical and legal requirements, including the easement needed to formalize the system.
Hydraulic design, plans, APC-CFIA permitting, materials supply, construction of the line extension, technical direction, pressure testing, interconnection coordination, AyA management and constitution of the easement in favor of AyA.
Infrastructure built and interconnected to the potable water system, meeting AyA's technical requirements to supply the residential development.




















| Tubería | 200 m |
| Código CFIA | 1114617 |
| Tasación | ₡15.000.000 |
| Servidumbre | En trámite de constitución a favor de AyA |
| Ubicación | San Miguel, Barranca, Puntarenas |
| Año | 2025 |
Let's talk about your project. The initial assessment is free.

The development was historically supplied by a private well and multiple expansions built over the years. Regulatory changes force…
View full case →
The development needed water availability and distribution infrastructure to meet AyA requirements and make the tourism project vi…
View full case →