The challenge
The project required potable water supply infrastructure and compliance with the water-capacity certificate, the Service Provision Regulation and AyA's current rules.

The project required potable water supply infrastructure and compliance with the water-capacity certificate, the Service Provision Regulation and AyA's current rules.
Hydraulic design, plans, APC-CFIA permitting, construction of the line extension, technical direction, AyA coordination, easement in favor of AyA, inspections, testing and support through final reception.
Line extension designed and built to AyA requirements to enable formal potable water supply. The third project from the same developer client.










| Tubería | 313 m |
| Código CFIA | 115599 |
| Tasación | ₡14.085.000 |
| Servidumbre | En trámite de constitución a favor de AyA |
| Cliente | Desarrollador recurrente (Big Door Prize) |
| Ubicación | Manuel Antonio, Quepos |
Let's talk about your project. The initial assessment is free.

The development was historically supplied by a private well and multiple expansions built over the years. Regulatory changes force…
View full case →
The development needed water availability and distribution infrastructure to meet AyA requirements and make the tourism project vi…
View full case →