The challenge

A residential project faced a requirement that killed its feasibility: building a sanitary sewer and treatment plant. It also needed a line extension, storm design and the availability letter.

The RAM solution

RAM built the 200 m line, designed the storm system and technically grounded the sewer exemption request before AyA's Environmental Unit — also filing claims before AyA's comptroller when the file stalled.

The result

Exemption approved in 2025 — the project became viable without a treatment plant — plus a positive availability letter. A case where consulting was worth more than construction.

Construction gallery

Technical data

Ramal200 m PVC 150 mm (CFIA 605794)
ExoneraciónAlcantarillado sanitario, UEN Ambiental AyA (2025)
Diseño pluvialAprobado, Municipalidad de Esparza
Expediente AyAFAM-5641
ClienteInmobiliaria Chorotega del Pacífico

Facing a similar challenge?

Let's talk about your project. The initial assessment is free.

Other projects

Big Door Prize — Quepos

Big Door Prize — Quepos

A foreign developer in Manuel Antonio needed potable water, but the connection required 2.2 km of pipeline, crossing a national ro

View full case
GranSol — Esparza

GranSol — Esparza

A social-interest subdivision in Esparza needed its complete potable water network, with the quality standards and tests AyA requi

View full case
🗨