800 mPVC pipeline 100 mm
₡32.0MCFIA valuation
100%received by AyA

The challenge

The development required formal potable-water service and hydraulic infrastructure to meet AyA requirements and make the residential project viable.

The RAM solution

Hydraulic assessment, AyA coordination, design, plans, APC-CFIA permitting, constitution and registration of the easement in favor of AyA, technical inspection of third-party works, pressure testing, interconnection and support through final reception.

The result

An 800 m line extension and interconnection approved by AyA, enabling formal potable-water supply for the development.

Technical data

Código CFIA1109676
Tasación₡31.971.575
Tubería800 m PVC 100 mm
ServidumbreConstituida a favor de AyA
UbicaciónNicoya, Guanacaste
Año2024

Facing a similar challenge?

Let's talk about your project. The initial assessment is free.

Other projects

El Salto — Quepos

El Salto — Quepos

The development was historically supplied by a private well and multiple expansions built over the years. Regulatory changes force

View full case
Big Door Prize — Quepos

Big Door Prize — Quepos

The development needed water availability and distribution infrastructure to meet AyA requirements and make the tourism project vi

View full case