The challenge
The project required building a potable-water catchment to meet the conditions set by AyA in the water-capacity certificate and guarantee supply for the condominium.
The project required building a potable-water catchment to meet the conditions set by AyA in the water-capacity certificate and guarantee supply for the condominium.
Construction of catchment works, technical direction, AyA coordination, supervision, functional testing, inspection support and final-reception management.
A catchment built and commissioned to meet AyA requirements and enable potable-water supply for the residential development.
| Código CFIA | 1188147 |
| Tasación | ₡7.000.000 |
| Tipo | Captación de agua potable |
| Destino | Desarrollo residencial |
| Ubicación | Curubandé, Liberia, Guanacaste |
| Año | 2026 |
Let's talk about your project. The initial assessment is at no cost.
1,615 m PVC pipeline 150 mmThe development was historically supplied by a private well and multiple expansions built over the years. Regulatory changes force…
View full case →
2,242 m PVC pipeline 100/150 mmThe development needed water availability and distribution infrastructure to meet AyA requirements and make the tourism project vi…
View full case →