The challenge
The project had to demonstrate, technically and documentarily, the existence, location, physical condition and validity of the supply source to meet the requirements of AyA, ORAC and the Water Directorate.

The project had to demonstrate, technically and documentarily, the existence, location, physical condition and validity of the supply source to meet the requirements of AyA, ORAC and the Water Directorate.
Georeferenced GNSS survey, field inspection, infrastructure verification, spatial validation against SINIGIR records, professional technical report, photographic documentation, file analysis and institutional coordination.
A supply source technically verified to support incorporating the Aurora La Luz BE-639 well into the system managed by ASADA Palestina.






| Alcance | Inscripción y regularización de fuente de abastecimiento |
| Fuente | Pozo Aurora La Luz BE-639 |
| Tecnología | Levantamiento GNSS de precisión |
| Validación | Análisis espacial contra registros SINIGIR |
| Instituciones | AyA, ORAC, Dirección de Aguas (MINAE) |
| Ubicación | Carrillo, Guanacaste |
Let's talk about your project. The initial assessment is free.

The ASADA needed to determine the real capacity of its supply system and meet AyA's technical requirements to support future water…
View full case →
The ASADA needed to understand the real state of its infrastructure, supply sources and operating conditions to identify improveme…
View full case →